CENTEGRA HEALTH SYSTEM | SOUTH STREET BEHAVIORAL HEALTH CAMPUS

LOCATION: WOODSTOCK, ILLINOIS

10,900 SF

This project includes the redesign, expansion and cosmetic upgrades to the existing Behavioral Health Inpatient Unit’s 19 beds at the South Street campus.

The expansion and redesign provides better workflow and security from both a staff and patient experience, as well as providing new amenities and expanding / upgrading existing amenities as required in a modern behavioral health unit.

This project was completed in phases over 18 months to keep the unit up and running 24/7 for the entire duration of the construction.